I used the “add a day” function thinking I was adding a day to the beginning of my trip and quickly clicking through it. I realized after though, that it added the day after the first day and shifted all activities down a day. Now i have to move 70 waypoints over 2 weeks to the previous day, so thanks for that.
How can I add or change the first day of the trip? I want to extend the trip forward, like from the 14th to the 13th, not add a day at the end.
Also how can I delete a day at the end?